The Hyderabad Metro Rail network uses state-of-the-art track infrastructure designed for durability, ride comfort, and minimal maintenance.
| SN. | CRITERIA | DIMENSION |
|---|---|---|
| 1. | Gauge | 1435 mm |
| 2. | Design speed Max. operating speed |
90 Kmph 80 Kmph |
| 3. | Max. axle load, loaded condition | 17 tonne |
| 4. | Maximum Gradient Normal / desirable Limit Exceptional Limit |
2.5% 4% |
| 5. | Sharpest vertical curve radius Sharpest horizontal curve radius |
1500m 120 m (main line track) 90 m (depot track |
| 6. | Traction power collection | Overhead Catenary system (OCS) at 25kV(AC) Rails shall be used for traction return current. |
| 7. | Inclination of Rail | 1 in 40 |
| 8. | Wheel tread profile | UIC 510-2 (S1002); to be interfaced with Rolling Stock Contractor. |