L&T Metro Rail (Hyderabad) Limited
About Us
Project Overview
Project Highlights
CSR
Policies
Financials
Annual Reports
Corporate Governance
Disclosures
Business Opportunities
HMR Passenger Website
News & Stories
Contact Us
HMR Passenger Website
News & Stories
Contact Us
  • L&T Metro Rail (Hyderabad) Limited
  • About Us
  • Project Highlights
  • Power Supply, Traction and SCADA System
Project Overview
Project Overview
Project Highlights
CSR
Policies
Financials
Annual Reports
Corporate Governance
Disclosures
Office

L&T Metro Rail (Hyderabad) Limited

Hyderabad Metro Rail Administrative Building
Uppal Main Road,
Nagole, Hyderabad
Telangana- 500039 

Tel: +91 40 2208 0000-01
Fax: +91 40 2208 0771

Business Opportunities

Follow Us

  • Copyright & Terms
  • Privacy Policy

© 2026 LARSEN & TOUBRO LIMITED. All rights reserved.

Power Supply, Traction and SCADA SystemPower Supply, Traction and SCADA System

POWER SUPPLY, TRACTION AND
SCADA SYSTEM

Power Supply and Traction System

Hyderabad Metro Rail operates on a standard gauge, fully electrified system with three elevated corridors powered through 25 kV, single-phase, 50 Hz overhead equipment (OHE). This ensures reliable traction power for smooth and efficient train operations. To minimize interference with communication lines, booster transformers are strategically installed along the corridors.

Receiving and Distribution Network

  • Receiving Substations (RSS) at Uppal, Miyapur, Yousufguda, and MGBS receive 132 kV power supply from APTRANSCO.
  • This supply is stepped down to 33 kV (three-phase) for station and depot utilities and 25 kV (single-phase) for traction requirements.
  • All RSS installations are Air-Insulated Substations (AIS), while Traction Substations (TSS) use Gas-Insulated Substation (GIS) technology.
  • Auxiliary Substations (ASS) are provided at each metro station, depot, and the Operation Control Centre (OCC) to distribute 33 kV/415 V low-voltage power for signalling, telecommunications, communications, and MEP systems.

Overhead Equipment (OHE)

The OHE system incorporates sectioning posts, sub-sectioning posts, and paralleling posts at key intervals, facilitating safe and efficient maintenance of the traction network.

SCADA-Based Centralized Control

A Supervisory Control and Data Acquisition (SCADA) system, housed at the centralized Operation Control Centre (OCC) in Uppal Depot, continuously monitors, controls, and commands the entire power supply and traction network. This system enables real-time oversight, quick fault detection, and seamless operational control across the metro corridors.

Technical Data
OHE at Main Line Conventional regulated type
OHE at Yards Tramway regulated type
System voltage 25 kV AC, 1Ø, 50 Hz
Design Speed 90 kmph
Operational Speed 80 kmph
Auxiliary Power Transformer 132/33 kV, oil type
Traction Power Transformer 132/25 kV, oil type
Auxiliary Transformer (at Station & Depots) 33/415 V, Dry Type
33 kV cable Ring main network
Height of OHE above the Rail level 5.00 Meter